Summer is now in full swing, the temperatures have just broken 100 this week and progress on the house is...well, progressing. And without further ado, the updates.
June 20th, soffits and moisture wrap go up.
June 25th, ceiling for the back porch goes in.
Ceiling for front porch goes in.
June 26th, back porch cedar posts installed and more wrap. Also, windows arrive and will go in the next day. Bracing in and around the home is starting to come down, revealing more and more of the home's true structure.
June 27th, pulled up to see that the guys have been busy! Almost every window installed.
Somewhere between the 25th and 26th, the final cedar beams were installed on the front porch. Beautiful!
Closer look at the finished ceiling.
Back porch windows. Love the transom windows, I'm really glad we did these, however, I wished we had continued them over the breakfast nook, just to the right of the back door in the photo.
The arch over the dining area. There's also a much smaller arch behind the post on the right, next to the front door. It will help to create a separation of rooms while the narrow opening will continue to make it feel open.
This is an arch over the doorway between the kitchen (left) and breakfast nook (right) that leads to the pantry, 1/2 bath, laundry and other bedrooms.
We've been tasked with picking out plumbing items, exterior paint trim, color for concrete stain, counter tops, and some door hardware. Next week, the roof.
Lots happening out at the ol' 7075.
Stay tuned!